Deye · PV inverters · Deye SUN-SG04LP3-EU (three-phase hybrid inverter, 5–12 kW)
F24DC_Insulation_Fault
Name in the manufacturer's documentation (fault list): DC_Insulation_Fault
[1]
In plain words (editorial)
The PV insulation resistance is too low. The manual names a loose or incorrect connection between the PV panels and the inverter, or the inverter's PE cable not connected to ground.
When to call a service technician: Have an installer check the PV connections and the PE cable. If it does not return to normal, contact your installer or Deye support.
✎ editorial – written from the cited sources, not a manufacturer statement. Status: draft.
For technicians
Detection conditions (source text)
- PV isolation resistance is too low[2]
Possible causes (source text)
Steps given by the manufacturer (source text)
⚠ Work on refrigerant circuits, mains electricity and PV DC wiring is for qualified technicians only.
The Polish page has more detail (plain-language explanation, safe checks, guides): Read in Polish →
Sources
Every statement has a footnote to the document and PDF page. “Quote verified” means the quote was found automatically in the text of that page.
- [1] Deye Three Phase Hybrid Inverter SUN-5-12KWSG04LP3 Fault List , p. 3 manufacturer document – copy from a distributor quote verified
F24 DC_Insulation_Fault
- [2] Hybrid Inverter User Manual – SUN-5K/6K/8K/10K/12K-SG04LP3-EU (ed. 2024-08) (V3.3.0 (instructions_sun-5-12k-sg04lp3-eu_240813_en)) , p. 48 official manufacturer document quote verified
PV isolation resistance is too low
- [3] Hybrid Inverter User Manual – SUN-5K/6K/8K/10K/12K-SG04LP3-EU (ed. 2024-08) (V3.3.0 (instructions_sun-5-12k-sg04lp3-eu_240813_en)) , p. 48 official manufacturer document quote verified
Check the connection of PV panels and inverter is firmly and
- [4] Hybrid Inverter User Manual – SUN-5K/6K/8K/10K/12K-SG04LP3-EU (ed. 2024-08) (V3.3.0 (instructions_sun-5-12k-sg04lp3-eu_240813_en)) , p. 48 official manufacturer document quote verified
Check whether the PE cable of inverter is connected
- [5] Hybrid Inverter User Manual – SUN-5K/6K/8K/10K/12K-SG04LP3-EU (ed. 2024-08) (V3.3.0 (instructions_sun-5-12k-sg04lp3-eu_240813_en)) , p. 48 official manufacturer document quote verified
Check the connection of PV panels and inverter is firmly and
- [6] Hybrid Inverter User Manual – SUN-5K/6K/8K/10K/12K-SG04LP3-EU (ed. 2024-08) (V3.3.0 (instructions_sun-5-12k-sg04lp3-eu_240813_en)) , p. 48 official manufacturer document quote verified
Check whether the PE cable of inverter is connected
- [7] Hybrid Inverter User Manual – SUN-5K/6K/8K/10K/12K-SG04LP3-EU (ed. 2024-08) (V3.3.0 (instructions_sun-5-12k-sg04lp3-eu_240813_en)) , p. 48 official manufacturer document quote verified
Seek help from us, if can not go back to normal state.