GoodWe · PV inverters · GoodWe ET G2 6–15 kW (three-phase hybrid inverter)
F134PID Abnormal
Name in the manufacturer's documentation (user manual): PID Abnormal
[1]
This page only quotes the original English documentation. A plain-language explanation has not been written yet, so the page is not indexed by search engines.
For technicians
Possible causes (source text)
- PIDhardware fault orPVovervoltage causesPIDpause[2]
Steps given by the manufacturer (source text)
- PVovervoltage-inducedPIDpause warning requires no action, PIDhardware fault can be cleared by turning offPIDswitch and turning it on again to clear thePIDfault; replace thePIDdevice.[3]
⚠ Work on refrigerant circuits, mains electricity and PV DC wiring is for qualified technicians only.
The Polish page has more detail (plain-language explanation, safe checks, guides): Read in Polish →
Sources
Every statement has a footnote to the document and PDF page. “Quote verified” means the quote was found automatically in the text of that page.
- [1] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 229 official manufacturer document quote verified
F134
- [2] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 229 official manufacturer document quote verified
PIDhardware fault orPVovervoltage causesPIDpause
- [3] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 229 official manufacturer document quote verified
PVovervoltage-inducedPIDpause warning requires no action,PIDhardware fault can be cleared by turning offPIDswitch and turning it on again to clear thePIDfault; replace thePIDdevice