Skip to content
EN

GoodWe · PV inverters · GoodWe ET G2 6–15 kW (three-phase hybrid inverter)

F160EMS Forced Off-grid

Name in the manufacturer's documentation (user manual): EMS Forced Off-grid[1]

In plain words (editorial)

The energy management system (EMS) issued a forced off-grid command, but the off-grid function is not enabled. The manual says to enable the off-grid function.

When to call a service technician: Ask your installer to adjust the settings.

✎ editorial – written from the cited sources, not a manufacturer statement. Status: draft.

The Polish page has more detail (plain-language explanation, safe checks, guides): Read in Polish →

Sources

Every statement has a footnote to the document and PDF page. “Quote verified” means the quote was found automatically in the text of that page.

  1. [1] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 234 official manufacturer document quote verified F160
  2. [2] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 234 official manufacturer document quote verified EMSissues a forced off-grid command, but the off-grid function is not enabled
  3. [3] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 234 official manufacturer document quote verified Enable the off-grid function