Skip to content
EN

GoodWe · PV inverters · GoodWe ET G2 6–15 kW (three-phase hybrid inverter)

F55Back-up Output Overload

Name in the manufacturer's documentation (user manual): Back-up Output Overload[1]

In plain words (editorial)

The back-up (off-grid) output is overloaded – the protection prevents continuous overload. The manual says to turn off some loads to reduce the off-grid output power.

When to call a service technician: If it repeats with fewer loads, contact your installer.

✎ editorial – written from the cited sources, not a manufacturer statement. Status: draft.

The Polish page has more detail (plain-language explanation, safe checks, guides): Read in Polish →

Sources

Every statement has a footnote to the document and PDF page. “Quote verified” means the quote was found automatically in the text of that page.

  1. [1] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 210 official manufacturer document quote verified
  2. [2] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 210 official manufacturer document quote verified Turn off some off-grid loads to reduce the inverter's off-grid output power
  3. [3] GoodWe Residential Smart Inverter Solutions – ET G2 6-15K (+ LX F / LX D) – User Manual V2.2 (2026-09-30) (V2.2-2026-09-30) , p. 210 official manufacturer document quote verified Prevent continuous Overload output of the inverter