Huawei · PV inverters · Huawei SUN2000-KTL-M1 (three-phase inverter, 3–10 kW, battery-ready)
Alarm 2091Abnormal reactive power scheduling instruction
Name in the manufacturer's documentation (fault list): Abnormal reactive power scheduling instruction
[1]
This page only quotes the original English documentation. A plain-language explanation has not been written yet, so the page is not indexed by search engines.
For technicians
Possible causes (source text)
Steps given by the manufacturer (source text)
⚠ Work on refrigerant circuits, mains electricity and PV DC wiring is for qualified technicians only.
The Polish page has more detail (plain-language explanation, safe checks, guides): Read in Polish →
Sources
Every statement has a footnote to the document and PDF page. “Quote verified” means the quote was found automatically in the text of that page.
- [1] Inverter Alarm Reference (Issue 14, 2026-06-15) (EDOC1100345192 Issue 14) , p. 84 official manufacturer document quote verified
2091 Abnormal reactive power scheduling instruction
- [2] Inverter Alarm Reference (Issue 14, 2026-06-15) (EDOC1100345192 Issue 14) , p. 84 official manufacturer document quote verified
the di input is abnormal.
- [3] Inverter Alarm Reference (Issue 14, 2026-06-15) (EDOC1100345192 Issue 14) , p. 84 official manufacturer document quote verified
the di input is inconsistent with the configuration.
- [4] Inverter Alarm Reference (Issue 14, 2026-06-15) (EDOC1100345192 Issue 14) , p. 84 official manufacturer document quote verified
check that the cables are connected correctly to the di ports.
- [5] Inverter Alarm Reference (Issue 14, 2026-06-15) (EDOC1100345192 Issue 14) , p. 84 official manufacturer document quote verified
check that the configuration combinations in the di signal configuration table for reactive power scheduling are complete and meet the requirements of the local power operator.