Skip to content
EN

SOFAR (Shenzhen SOFARSOLAR) · PV inverters · SOFAR 3.3–12KTLX-G3 (three-phase grid inverter)

ID161ForceShutdown

Name in the manufacturer's documentation (fault list): ForceShutdown[1]

In plain words (editorial)

Forced shutdown via remote control. If you did not trigger it yourself, the manual says to disconnect the DC switch, wait 5 minutes, switch it on again and check whether the fault has cleared after the restart.

When to call a service technician: If the fault remains, contact Sofar customer service (via your installer).

✎ editorial – written from the cited sources, not a manufacturer statement. Status: draft.

The Polish page has more detail (plain-language explanation, safe checks, guides): Read in Polish →

Sources

Every statement has a footnote to the document and PDF page. “Quote verified” means the quote was found automatically in the text of that page.

  1. [1] SOFAR 3.3~12KTLX-G3 – User Manual (2024-10) , p. 75 official manufacturer document quote verified ForceShutdown
  2. [2] SOFAR 3.3~12KTLX-G3 – User Manual (2024-10) , p. 75 official manufacturer document quote verified If it is not controlled by yourself, please disconnect the DC switch of the inverter, wait for 5 minutes, and then turn on the DC switch
  3. [3] SOFAR 3.3~12KTLX-G3 – User Manual (2024-10) , p. 75 official manufacturer document quote verified Observe whether the fault has been eliminated after the inverter is restarted
  4. [4] SOFAR 3.3~12KTLX-G3 – User Manual (2024-10) , p. 75 official manufacturer document quote verified If not, please contact the customer service of SOFARSOLAR
  5. [5] SOFAR 3.3~12KTLX-G3 – User Manual (2024-10) , p. 75 official manufacturer document quote verified Remote control enables