Skip to content
EN

SolarEdge · PV inverters · SolarEdge SE3K–SE10K (three-phase inverter with power optimizers, SetApp)

Error 3x136Verify the RS 485 connections between the Inverters. Perform Follower detect in Go.

Name in the manufacturer's documentation (fault list): Verify the RS 485 connections between the Inverters. Perform Follower detect in Go.[1]

This page only quotes the original English documentation. A plain-language explanation has not been written yet, so the page is not indexed by search engines.

The Polish page has more detail (plain-language explanation, safe checks, guides): Read in Polish →

Sources

Every statement has a footnote to the document and PDF page. “Quote verified” means the quote was found automatically in the text of that page.

  1. [1] SolarEdge Inverters Error Codes and Troubleshooting – User Guide (Version 1.2, 2026-09) (se-inverter-installation-guide-error-codes (v1.2)) , p. 8 official manufacturer document quote verified 3x13 Verify the RS 485 connections
  2. [2] SolarEdge Inverters Error Codes and Troubleshooting – User Guide (Version 1.2, 2026-09) (se-inverter-installation-guide-error-codes (v1.2)) , p. 8 official manufacturer document quote verified Need to know why the system locked in the first place
  3. [3] SolarEdge Inverters Error Codes and Troubleshooting – User Guide (Version 1.2, 2026-09) (se-inverter-installation-guide-error-codes (v1.2)) , p. 8 official manufacturer document quote verified OFF/ON to Reconnect
  4. [4] SolarEdge Inverters Error Codes and Troubleshooting – User Guide (Version 1.2, 2026-09) (se-inverter-installation-guide-error-codes (v1.2)) , p. 8 official manufacturer document quote verified Contact support