Skip to content
EN

Daikin · Heat pumps · Daikin Altherma 3 R F (split heat pump, R32)

AH-00Tank disinfection function not completed correctly

Name in the manufacturer's documentation (service manual): Tank disinfection function not completed correctly[1]

In plain words (editorial)

The tank disinfection function did not complete – it was interrupted by hot water use, stopped manually, or a large hot water draw happened shortly before it started. The manual says to schedule disinfection when no hot water use is expected for the next 4 hours and not to stop tank operation during disinfection.

When to call a service technician: This is a settings issue; ask your installer to adjust the schedule if it keeps happening.

✎ editorial – written from the cited sources, not a manufacturer statement. Status: draft.

The Polish page has more detail (plain-language explanation, safe checks, guides): Read in Polish →

Sources

Every statement has a footnote to the document and PDF page. “Quote verified” means the quote was found automatically in the text of that page.

  1. [1] Daikin Altherma 3 R F – ERGA04~08E + EHVH/X04+08S18+23E – Installer reference guide (4P629086-1D (2024.04)) , p. 254 official manufacturer document quote verified AH-00 Tank disinfection function not completed
  2. [2] Daikin Altherma 3 R F – ERGA04~08E + EHVH/X04+08S18+23E – Installer reference guide (4P629086-1D (2024.04)) , p. 252 official manufacturer document quote verified The disinfection function was
  3. [3] Daikin Altherma 3 R F – ERGA04~08E + EHVH/X04+08S18+23E – Installer reference guide (4P629086-1D (2024.04)) , p. 252 official manufacturer document quote verified The disinfection operation was stopped manually
  4. [4] Daikin Altherma 3 R F – ERGA04~08E + EHVH/X04+08S18+23E – Installer reference guide (4P629086-1D (2024.04)) , p. 252 official manufacturer document quote verified Large domestic hot water tapping
  5. [5] Daikin Altherma 3 R F – ERGA04~08E + EHVH/X04+08S18+23E – Installer reference guide (4P629086-1D (2024.04)) , p. 252 official manufacturer document quote verified Program the start-up of the disinfection
  6. [6] Daikin Altherma 3 R F – ERGA04~08E + EHVH/X04+08S18+23E – Installer reference guide (4P629086-1D (2024.04)) , p. 252 official manufacturer document quote verified Do NOT stop tank operation during
  7. [7] Daikin Altherma 3 R F – ERGA04~08E + EHVH/X04+08S18+23E – Installer reference guide (4P629086-1D (2024.04)) , p. 256 official manufacturer document quote verified recommended to program the start-up of the disinfection function at least
  8. [8] Daikin Altherma 3 R F – ERGA04~08E + EHVH/X04+08S18+23E – Installer reference guide (4P629086-1D (2024.04)) , p. 256 official manufacturer document quote verified Eco action 3 hours before the scheduled start-up of the disinfection function to